Gas Service Line Installation Form | Northwest PA Businesses| National Fuel

Service Line Installation Application Form

Service Line Installation Application Form

Pennsylvania Business Gas Service Line Installation Application

Fill out the form below and click the button to generate a PDF. Then please mail to National Fuel at 225 Wayne Street, Erie, PA 16507 or fax to 814-871-8312.

    Service Line Application

    Is the structure New or Existing?*

    *required

    Has there ever been National Fuel gas service to this property?*

    *required

    If yes, were you the owner at the time?*

    *required

    Please list any existing or active account numbers the applicant may have with National Fuel:





    Is this a fuel conversion?*

    *required

    *required

    *required

    Is there a gas well or alternative gas supply on the premise?*

    *required

    Will National Fuel be your only heat source?*

    *required

    *required

    Will this gas service be funded, in whole or in part, by grant funds?*

    *required

    (Please provide a copy of the deed to NFG)

    Address where you are requesting service

    *required

    *required

    *required

    *required

    Please note: The investigation will take place when the foundation is complete.

    Site plans may be required. If available, please include a site plan with the application.

    Mailing Address of Deeded Property Owner

    *required

    *required

    *required

    *required

    Upon receipt of this application, a service investigation will be generated. The investigation may take from 1 to 3 weeks to complete depending on various factors including backlog, weather, and emergencies. The investigation identifies the location of existing facilities and the requirements to serve the structure.

    Once the investigation is complete, an invoice will be provided detailing any required payments and instructions to proceed with the new service. Payment and agreements must be returned to National Fuel before approval is granted for installation of the new service. Depending on the requirements for the new service, the time for installation will vary. If the new service requires an extension of our main gas line, it will take much longer due to additional requirements such as obtaining right of ways and permits. Please plan accordingly! The time from when the application is received until the new service is installed could be 8 weeks or more.

    A security deposit may be required before the gas meter is installed.

    Please provide the gas equipment and BTU input/hour for each meter requested:

    Meter #

    New/Added Gas Equipment

    BTU Input/Hr

    Number of Units

    Total Btu/Hr Input (Load)

    Required Delivery Pressure

    Add New/Added Equipment

    Meter #

    Existing Gas Equipment

    BTU Input/Hr

    Number of Units

    Total Btu/Hr Input (Load)

    Required Delivery Pressure

    Add Existing Equipment

    *required

    *required

    Normal delivery pressure is 4 ounces (7 inches of water column). Requests for pressure above 4 ounces (7 inches of water column) must be approved by National Fuel’s Engineering Department. Additional documentation and time will be required.